2011

So I didn’t quite make last year’s goals. But I still think I did great!

1. Lose 20 lbs: I lost 6.8. I am not mad about this! I lost almost 7 lbs, that’s awesome!

2. Read 52 books: I read 26, unless I forgot to write any down. I intentionally let myself slide on this because I realized early on that sometimes reading that much caused me to ignore other things. So I feel really good about the choice to ease up.

3. Make a dress or shirt for each woman in my family: I knew this was a big one, and I actually did not make a single garment for any of them. But I did manage to make several things for myself and Dexter, do those count???

Other things I accomplished this year:

I made TONS of crafts. TONS. I wanted to do a special photo post where I showed off everything I made. However, that turned out to be a nearly impossible task. You will not be seeing that post.

My sister and I participated in Santa’s Workshop. That was such a great experience! We got to share our crafts with the public, we bonded over common interests, and we got paid to do it. Sweet!

We moved to a new city. This is not my favorite accomplishment of 2010, and I’m still adjusting, but it was great that my husband found a new job after being laid-off.

2011 goals:

1. Lose 15 lbs.

If I make this goal, I will have completed the 20 I wanted to lose. But even if I only lose 5 by the end of the year, I’m going to be pumped! I am actively working toward this goal already, so I have a bit of a head start.

2. Work out at least 10 min everyday (except if I’m sick).

I’ve already been doing this for over 2 weeks! I actually started the day of my 30th birthday, and I’m trying to keep up that commitment. I know 10 min sounds really wimpy, but it means I don’t cut myself any slack. I *can* move with purpose for 10 minutes. Most days it’s 20 or 30 min of activity.

3. Read 24 books.

I’m certain I can match 2010’s progress. 2 books a month isn’t unreasonable, and if I really want to read more I can!

4. Commit to 2 weeks of my Secret 2011 Goal:

I’ll blog about this attempt later. It’s one of those things that I will not talk about until I either do it and succeed or fail and try to be the first to make fun of myself.

5. Unofficial Goal: Blog more frequently.

I’m not going to set a timeline, but I do want to blog more. It was hard this winter because I was too busy to really document everything.

I don’t plan to make any crafty goals this year. I already have a backlog of orders I’m trying to get through, so there is no way I intend to put more things on my plate. I’m really pleased with my progress last year, so I’m basically just going to try to keep up that pace!

Mapping Out My Quilting Plan

It occurred to me last night that I have 5 months to finish my 3 Christmas quilts. I can be a bit of a procrastinator. 5 months sounds like forever, right??

But when I divide that by 3 quilts, that’s roughly 1.67 months per quilt! Um… time to panic!

So, I have to make myself start putting some quality time into those quilts. Not only have I taken on a gargantuan task, but I also chose to venture into unknown and potentially complicated pattern territory.

It’s so hard for me to focus on just one project. I get bored, or I get super excited about something else! But I have to harness my energy, because I don’t want to give my sisters IOU’s for Christmas. That would be jerky.

So, here’s the plan:

Quilt #1- Deborah’s Owl Quilt

IMG_4941 IMG_5215

The front of the quilt will have 12 pink and blue blocks, shashed with dark brown. At least one block will have an owl. My sister wanted to think about how many owls she wanted 🙂

IMG_5217 The back will have a pink and brown striped fabric, with a strip of pieces from the front along the bottom. Then I’m going to attempt to do a tree in brown, via ohfrannson!. I probably will not do patchwork on this tree, because I really don’t think it’s necessary. And then I’ll have 3 little owls peeking out of holes in the tree.

I have 6 blocks completed. So if I could do 1 block per day I’d be done in a week.

Week 1: Complete blocks.

Week 2: Cut sashing and piece blocks together.

Week 3: Work on the back. (I’m going to call this one week’s worth of work, but I don’t actually know how long this will take.

Week 4: Sandwich quilt and start quilting!

Week 5: Quilt.

Week 6: Bind the edges and clip threads.

Quilt #2- Alisha’s Bird Quilt

I have all the fabric for this quilt, and a general idea, but it’s still mostly in my head. It will consist of some combination of the following fabrics:

IMG_5233 And it will have a design similar to this:IMG_5224 I sketched this out without really paying attention to the quantities of fabric I have on hand. Most likely I will have to play around with color combinations. So, Alisha, don’t get attached to it 🙂 Also, I’m not sure about how to put this together, so I sure hope ohfrannson! has a pattern!!

Week 1: Work on planning. Which color do I have enough of for the background, trees, etc?

Week 2: Cut fabric.

Week 3: Piece back ground.

Week 4: Piece tree 1.

Week 5: Piece tree 2.

Week 6: Piece tree 3.

Week 7: Cut back pieces.

Week 8: Piece back. Appliqué birds on front and back.

Week 9: Sandwich and quilt.

Week 10: Bind the edges and clip threads.

(Uh-oh. This plan is 4 weeks over time-budget.)

Quilt #3- Michelle’s Bird Quilt

Sigh. Now that I’ve mapped out Alisha’s quilt, I know Michelle’s is essentially the same except in different colors. So, it, too, is slated for 4 extra weeks. I can’t let this happen! I just need to remember this is just an estimate and kick it into high gear!

Michelle’s fabrics:IMG_5241 This batch is a little messy because I’m currently using some of the fabrics for another project 🙂

And for some reason, I thought it would be faster to revamp the same picture in Paint. It was *not* faster, but it was fun 🙂final painted bird quilt IMG_5224

Week 1: Work on planning. Which color do I have enough of for the background, trees, etc?

Week 2: Cut fabric.

Week 3: Piece back ground.

Week 4: Piece tree 1.

Week 5: Piece tree 2.

Week 6: Piece tree 3.

Week 7: Cut back pieces.

Week 8: Piece back. Appliqué birds on front and back.

Week 9: Sandwich and quilt.

Week 10: Bind the edges and clip threads.

Wish me luck! And the ability to focus. I’ll need it.